|
Letter governing use of 20-foot lengths of PVC pipe in sewer construction - cancellation of previous variance.
ENG2005-01 Private
Service Lateral (HCS) Design and Construction Requirements
Memorandum of Understanding Regarding Construction of Private Cleanouts - PDF form or Word form - March 28, 2007.
Based on the ENG2005-01 Directive, this form is a required submittal ensuring adherence to PCRWRD's HCS cleanout standards and listing all lots with buried HCS cleanouts.
ENG2005-02 Manhole
with Joint Reinforcement - Standard Detail 223
ENG2005-03 Public
Sewer Stub-Out
ENG2005-04 Engineering
Standards Committee
ENG2005-05 Maintenance
Vehicle Access Within Cul-de-Sacs
ENG2005-06 Short
Easement Access
ENG2006-08 Private Sewer Laterals in a Terminal Manhole
ENG2006-09 Flow
Management Considerations During Design
ENG2006-10 Cones and Grade Rings in Manhole Construction
ENG2006-11 Survey Cut Sheet Deliverable
Download form for Survey Cut Sheet Deliverable - Word File or PDF. (This form is the standard form for written or typed data. If an electronic survey download is used, the form may be replaced, but all information and table format must be retained.)
ENG2006-13 Manhole Invert Slopes
ENG2006-15 Manhole Interior Coating Requirements
ENG2008-16 Revised Sand Bedding for Sanitary Sewers - Standard Details WWM-104 and WWM-105
ENG2008-17 CCTV Inspection for New Sewer Construction Acceptance
Return
to Online Design Services
Viewing PDF Documents:
You will need Adobe Acrobat Reader to view these documents.
Adobe Acrobat Reader is free and can be downloaded from the
Adobe home page.
|